<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>www.it-pruefungen.de IT-Prüfungsvorbereitung Prüfungsfragen Testengine &#187; Prüfung C_TSCM42_65</title>
	<atom:link href="http://itpruefungen.de/tag/prufung-c_tscm42_65/feed/" rel="self" type="application/rss+xml" />
	<link>https://itpruefungen.de</link>
	<description>deutsche originale Prüfungsfragen</description>
	<lastBuildDate>Fri, 27 Mar 2026 08:15:58 +0000</lastBuildDate>
	<language>de-DE</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.4.2</generator>
		<item>
		<title>C_TSCM42_65 Prüfungsfragen</title>
		<link>https://itpruefungen.de/2018/08/08/c_tscm42_65-pruefungsfragen/</link>
		<comments>https://itpruefungen.de/2018/08/08/c_tscm42_65-pruefungsfragen/#comments</comments>
		<pubDate>Wed, 08 Aug 2018 12:36:07 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Allgemein]]></category>
		<category><![CDATA[Prüfung C_TSCM42_65]]></category>
		<category><![CDATA[Prüfungsvorbereitung C_TSCM42_65]]></category>

		<guid isPermaLink="false">https://itpruefungen.de/?p=81</guid>
		<description><![CDATA[www.it-pruefungen.de C_TSCM42_65 Prüfungsfragen, C_TSCM42_65 Examensfragen SAP Certified Application Associate &#8211; Production &#8211; Planning &#38; Manufacturing with SAP ERP 6.0 EHP5 (ICND2 v3.0) QUESTION NO: 1 What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) &#8230; <a href="https://itpruefungen.de/2018/08/08/c_tscm42_65-pruefungsfragen/">Weiterlesen <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p>www.it-pruefungen.de <a href="https://www.it-pruefungen.de/C_TSCM42_65.htm">C_TSCM42_65 Prüfungsfragen</a>, C_TSCM42_65 Examensfragen SAP Certified Application Associate &#8211; Production &#8211; Planning &amp; Manufacturing with SAP ERP 6.0 EHP5 (ICND2 v3.0)</p>
<p>QUESTION NO: 1<br />
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)</p>
<p>A. Availability check<br />
B. Digital signature<br />
C. Resource selection<br />
D. Electronic batch record<br />
E. Approved master recipes</p>
<p>Answer: B,D,E</p>
<p>QUESTION NO: 2<br />
Which of the following statements about consumption are correct? (Choose two)</p>
<p>A. Consumption takes place on the material level between the planned independent requirements and the planned orders.<br />
B. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.<br />
C. Consumption is restructured with the planning run.<br />
D. Consumption can take place between order reservations and planned independent<br />
requirements, depending on the strategy.</p>
<p>Answer: B,D</p>
<p>QUESTION NO: 3<br />
Where can you define the valid receivers for production order costs?</p>
<p>A. In the valuation variant<br />
B. In the production scheduling profile<br />
C. In the settlement profile<br />
D. In the costing variant</p>
<p>Answer: C</p>
<p>Prüfungsvorbereitung C_TSCM42_65 Studienmaterial deutsch SAP Certified Application Associate &#8211; Production &#8211; Planning &amp; Manufacturing with SAP ERP 6.0 EHP5  https://www.it-pruefungen.de/C_TSCM42_65.htm</p>
<p>QUESTION NO: 4<br />
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.<br />
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?</p>
<p>A. Interactive single-item planning for the delayed assembly<br />
B. Multi-level single-item planning with the &#8220;simulation mode&#8221; option<br />
C. Total planning online<br />
D. Multi-level single-item planning with the &#8220;display material list&#8221; option</p>
<p>Answer: B</p>
<p>QUESTION NO: 5<br />
What does SAP ERP mean?</p>
<p>A. SAP ERP is a planning system in which extended planning processes can be mapped.<br />
B. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials management, production and so on.<br />
C. SAP ERP is a technological platform, on the basis of which customer-specific extensions can be imported.<br />
D. SAP ERP is an application that an enterprise can use to manage its business processes efficiently.</p>
<p>Answer: D</p>
<p>IT-Prüfungen <a href="https://www.it-pruefungen.de/C_TSCM42_65.htm">C_TSCM42_65</a> SAP Certified Application Associate &#8211; Production &#8211; Planning &amp; Manufacturing with SAP ERP 6.0 EHP5 www.it-pruefungen.de</p>
<p>QUESTION NO: 6<br />
Which functions can be triggered before releasing a production order? (Choose three)</p>
<p>A. Confirmation<br />
B. Selection of a routing<br />
C. Scheduling<br />
D. Stock determination<br />
E. Selection of a BOM</p>
<p>Answer: B,C,E</p>
]]></content:encoded>
			<wfw:commentRss>https://itpruefungen.de/2018/08/08/c_tscm42_65-pruefungsfragen/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
