C_THR12_67 übungstest, C_THR12_67 Prüfungsvorbereitung

C_THR12_67 übungstest, C_THR12_67 Prüfungsvorbereitung Studienmaterial deutsch SAP Certified Application Associate – SAP HCM with ERP 6.0 EHP7 www.it-pruefungen.de

QUESTION NO: 1
Which organizational entity is used to determine the country grouping of an employee? Please choose the correct answer.

A. Cost center
B. Employee group
C. Personnel area
D. Organizational unit

Answer: C

QUESTION NO: 2
How do you assign one job and several tasks to a position using the B 007 “describes by” relationship? Please choose the correct answer.

A. Assign time constraint 1 to the job.
B. Assign time constraint 2 to the task.
C. Assign a time constraint that depends on the target object.
D. Assign time constraint 3 to the position.

Answer: C

IT-Prüfungen C_THR12_67 SAP Certified Application Associate – SAP HCM with ERP 6.0 EHP7  https://www.it-pruefungen.de/C_THR12_67.htm

QUESTION NO: 3
What system switch is read when the data consistency check report (RHCHECK0) is executed? Please choose the correct answer.

A. PBABT PBABT
B. PLOGI EVENB
C. PLOGI PLOGI
D. PLOGI ORGA 4.

Answer: C

QUESTION NO: 4
Which of the following combinations are control indicators for employee subgroup groupings? Please choose the correct answer.

A. Substitution types
Wage types
B. Absence quotas
Work schedule rules
C. Availability types
Wage types
D. Absence types
Work schedule rules

Answer: B

C_THR12_67 Prüfungsfragen SAP Certified Application Associate – SAP HCM with ERP 6.0 EHP7 www.it-pruefungen.de

QUESTION NO: 5
What functions do features perform? Note: There are 2 correct answers to this question.

A. Calculate default hourly rate on the Basic Pay infotype (IT0008).
B. Propose default country on the Address infotype (IT0006).
C. Propose default values on the Planned Working Time infotype (IT0007).
D. Incorporate values from the Organizational Assignment infotype (IT0001).

Answer: CD

C_THR82_1411 Prüfungsfragen

Q1
www.it-pruefungen.de-What would you consider when using objective category weights?

There are 2 correct answers to this question.

Response:

A. Category weight is independent of overall min/max weight.
B. A minimum/maximum weight may be set for each category.
C. A minimum/maximum weight must be the same for every category.
D. Default category min/max weight must be within overall min/max weight limit.

Answer: A,B

www.it-pruefungen.de C_THR82_1411 Prüfung, C_THR82_1411 zertifizierung SAP Certified Application Consultant – SuccessFactors Performance and Goals

Q2

How do you lock a goal plan?

There are 2 correct answers to this question.

Response:

A. Configure the element in a Performance form template XML.
B. Configurethe element in a Goal plan template XML.
C. Configurethe attribute in Performance form template XML.
D. Configure the switches block of code in Goal plan template XML.

Answer: B,D

C_THR82_1411 Prüfungsfragen, C_THR82_1411 Examensfragen SAP Certified Application Consultant – SuccessFactors Performance and Goals (ICND2 v3.0)  https://www.it-pruefungen.de/C_THR82_1411.htm

Q3

Which compensation permissions are typically enabled for human resource business partners?

There are 3 correct answers.

Response:

A. Change User Information
B. Run Ad Hoc Reports
C. Manage Plan Template
D. Compensation Management
E. Executive Review Read

Answer: B,D,E

Q4

Where do you enable the spell check feature for a Performance Management Form template?

There are 2 correct answers to this question.

Response:

A. In Provisioning -> Form Template Administration
B. In Admin Tools -> Form Template Settings
C. In the Meta section of the form template
D. In Provisioning -> Company Settings

Answer: B,D

C_THR82_1411 Prüfungsvorbereitung Studienmaterial deutsch SAP Certified Application Consultant – SuccessFactors Performance and Goals www.it-pruefungen.de

Q5

You configure the following salary rule in the compensation plan template XML.

100.0</comp-salary-rule- threshold>

On the compensation worksheet, a planner enters a merit increase, which puts the employee’s final salary over the maximum for the salary range. How does the system behave?

Response:

A. A popup message asks the planner if the exceeded amount should be assigned to lump sum. The planner cannot save the merit increase by selecting “Cancel” in the pop-up message.
B. The rule prevents the planner from saving the merit increase. The planner must go back and change their merit recommendation.
C. The rule alerts the planner that the range penetration threshold has been exceeded and the merit field text turns red. The planner saves the merit recommendation.
D. A popup message asks the planner if the exceeded amount should be assigned to lump sum. The planner can save the merit recommendation by selecting “Cancel” in the pop-up message.

Answer: B

C_THR88_1508 Prüfungsfragen

QUESTION 1
www.it-pruefungen.de-Your customer wants certain personnel to be granted access to SuccessFactors Learning to support the management of training related activities and reports.
What must you do to meet this requirement?
There are 3 correct answers to this question.
Response:

A.Add domain restrictions to the instructor record
B.Add scheduled offering and report workflows to the admin role.
C.Create an admin role for the personnel
D.Create a reporting role to the instructor record
E.Create admin accounts for the personnel.

Answer: BCE

www.it-pruefungen.de C_THR88_1508 Prüfungsvorbereitung  deutsch SAP Certified Application Associate – SAP SuccessFactors Learning Management Q3/2015

QUESTION 2
For which of these content object launch methods should you always select the “Mark this object complete when launched” checkbox?

There are 2 correct answers to this question.

Response:

A.SCORM 12
B.AICC
C.Browser
D.Document Type

Answer: CD

IT-Prüfungen C_THR88_1508 SAP Certified Application Associate – SAP SuccessFactors Learning Management Q3/2015  https://www.it-pruefungen.de/C_THR88_1508.htm

QUESTION 3
What should be considered when associating a pre exam or post exam with a learning item?

Please choose the correct answer.

Response:

A.The exam results are shown in the learning evaluation report from only the post exam.
B.The exam is delivered to users via email, so only participants with a valid email can participate
C.The exam object must first be associated with the item as content before it can be selected as a pretest or Post-test.
D.The exam object can be attached to the item once and used as both the pre-test and post-test.

Answer: C

QUESTION 4
What must you do before integrating SuccessFactors Learning to SuccessFactors HCM?

There are 2 correct answers to this question.

Response:

A.Acquire the data center ID for SuccessFactors HCM
B.Acquire the Jam URL for SuccessFactors HCM
C.Acquire provisioning access for SuccessFactors HCM
D.Acquire the Company ID for SuccessFactors HCM

Answer: CD

C_THR88_1508 Prüfungsfragen SAP Certified Application Associate – SAP SuccessFactors Learning Management Q3/2015 www.it-pruefungen.de

QUESTION 5
Using SuccessFactors Connectors, which of the following are valid schedules to import a user file?

There are 2 correct answers to this question.

Response:

A.Mondays at 5:00 AM Eastern Time
B.Daily at 1:00 AM, 3:30 AM and 4:00 AM eastern time
C.First day of each month starting at 4:00 AM pacific time
D.Twice a month on the first and 15th days at 3:00 AM eastern time

Answer: AC

C_TPLM30_65 Prüfungsvorbereitung

Q1

Which of the following are prerequisites for business completion? (Choose two)

A. The order must have actual costs.
B. The order must be fully settled.
C. The balance of the order must be zero.
D. The order must have planned costs.

Answer: B,C

www.it-pruefungen.de C_TPLM30_65 Prüfungsvorbereitung Studienmaterial deutsch SAP Certified Application Associate – Enterprise Asset Management (Maintenance & Repair) with SAP ERP 6.0 EHP5

Q2
What information does the value category provide in the maintenance order?

A. The costs details for individual technical objects
B. The costs by work center
C. The material costs by valuation category
D. A summary of costs for multiple cost elements

Answer: D

Q3
Which of the following Customizing settings is required to assign a notification to a maintenance order operation?

A. Assignment of operations to all object list entries active
B. Assignment of order type to notification type
C. Maintain indicator for notification data on order header
D. Create default value profiles for general order data

Answer: A

Q4
When the user creates a maintenance plan for a call object (order), which value in the planning data determines the order type?

A. Priority
B. Maintenance activity type
C. Maintenance planner group
D. Main work center

Answer: C

SAP Certified Application Associate – Enterprise Asset Management (Maintenance & Repair) with SAP ERP 6.0 EHP5 www.it-pruefungen.de

Q5
A maintenance technician replaces a defective counter with a new counter.

Before the users can create a standard measuring document for the new counter, what step(s) must they perform?

A. Create a new technical object to represent the new measuring point.
B. Create a special measuring document and set the Counter Replacement indicator.
C. Dismantle the old measuring point and create a new measuring point.
D. Create a new measuring point and change the measuring point from which the measurement reading was transferred.

Answer: B

Q6
A user has planned an operation with labor costs and material costs; however, the material cost element is not assigned to a value category.

Where do the material costs appear in the value categories for the order?

A. In the overhead value category
B. In a new, automatically created value category
C. In the unassigned value category
D. In the internal activity value category

Answer: C

C_TPLM30_65 Prüfungsfragen SAP Certified Application Associate – Enterprise Asset Management (Maintenance & Repair) with SAP ERP 6.0 EHP5  https://www.it-pruefungen.de/C_TPLM30_65.htm

C_TPLM30_66 Prüfungsfragen

QUESTION NO: 1

it-pruefungen.de-Which of the following are prerequisites for business completion? (Choose two)

A. The order must have actual costs.
B. The order must be fully settled.
C. The balance of the order must be zero.
D. The order must have planned costs.

Answer: B,C

www.it-pruefungen.de C_TPLM30_66 Prüfungsfragen, C_TPLM30_66 Examensfragen Enterprise Asset Management (Maintenance & Repair) with SAP ERP 6.0 EHP6 (ICND2 v3.0)

QUESTION NO: 2

What information does the value category provide in the maintenance order?

A. The costs details for individual technical objects
B. The costs by work center
C. The material costs by valuation category
D. A summary of costs for multiple cost elements

Answer: D

QUESTION NO: 3

Which of the following Customizing settings is required to assign a notification to a maintenance order operation?

A. Assignment of operations to all object list entries active
B. Assignment of order type to notification type
C. Maintain indicator for notification data on order header
D. Create default value profiles for general order data

Answer: A

C_TPLM30_66 Prüfungsvorbereitung Studienmaterial deutsch Enterprise Asset Management (Maintenance & Repair) with SAP ERP 6.0 EHP6 www.it-pruefungen.de

QUESTION NO: 4

When the user creates a maintenance plan for a call object (order), which value in the planning data determines the order type?

A. Priority
B. Maintenance activity type
C. Maintenance planner group
D. Main work center

Answer: C

QUESTION NO: 5

A maintenance technician replaces a defective counter with a new counter.
Before the users can create a standard measuring document for the new counter, what step(s) must they perform?

A. Create a new technical object to represent the new measuring point.
B. Create a special measuring document and set the Counter Replacement indicator.
C. Dismantle the old measuring point and create a new measuring point.
D. Create a new measuring point and change the measuring point from which the measurement reading was transferred.

Answer: B
IT-Prüfungen C_TPLM30_66 Enterprise Asset Management (Maintenance & Repair) with SAP ERP 6.0 EHP6 www.it-pruefungen.de

Prüfungsvorbereitung C_TPLM30_67

www.it-pruefungen.de Prüfungsvorbereitung C_TPLM30_67 Studienmaterial deutsch SAP Certified Application Associate – SAP Maintenance & Repair with ERP 6.0 EHP7

Q1
In order type Customizing, you can set the default for when the purchase requisition is created to immediately, from release, or never. For which combination must you set the default? Please choose the correct answer.
Response:

A. Order type and planner group
B. Order type and plant
C. Order type and responsible work center
D. Order type and material type

Answer: B

Q2
How the settlement rule for suborder is to be determine in the Customizing setting for order type .
Please choose the correct answer.
Response:

A. Copy the main order as the settlement receiver
B. Do not copy order
C. Apply CATS
D. None of the above

Answer: A

Q3
You want to set up an external refurbishment process through subcontracting, using material requirements planning (MRP)? Which of the following must you set in the system? Please choose the correct answer.
Response:

A. The Special Procurement indicator in the material master record
B. The Subcontracting flag for the refurbishment order type
C. The Material Provision indicator for special stock in the refurbishment order header
D. The Subcontracting flag in the refurbishment order header

Answer: A

Q4
You use the F4 key to…
Choose the correct answer(s).
Response:

A. Start another session
B. Obtain technical details for a program
C. Call the SAP Library
D. Show possible input values for an entry field
E. Generate an output request for the current screen

Answer: D

IT-Prüfungen C_TPLM30_67 SAP Certified Application Associate – SAP Maintenance & Repair with ERP 6.0 EHP7  https://www.it-pruefungen.de/C_TPLM30_67.htm

Q5
Which is not the phase of corrective Maintenance
Please choose the correct answer.
Response:

A. Notification
B. Planning
C. Control
D. Base

Answer: D

Q6
How many types of catalog are there?
Please choose the correct answer.
Response:

A. 2
B. 3
C. 4
D. 5

Answer: D

C_TPLM30_67 Prüfungsfragen SAP Certified Application Associate – SAP Maintenance & Repair with ERP 6.0 EHP7 www.it-pruefungen.de

C_TSCM42_65 Prüfungsfragen

www.it-pruefungen.de C_TSCM42_65 Prüfungsfragen, C_TSCM42_65 Examensfragen SAP Certified Application Associate – Production – Planning & Manufacturing with SAP ERP 6.0 EHP5 (ICND2 v3.0)

QUESTION NO: 1
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

A. Availability check
B. Digital signature
C. Resource selection
D. Electronic batch record
E. Approved master recipes

Answer: B,D,E

QUESTION NO: 2
Which of the following statements about consumption are correct? (Choose two)

A. Consumption takes place on the material level between the planned independent requirements and the planned orders.
B. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
C. Consumption is restructured with the planning run.
D. Consumption can take place between order reservations and planned independent
requirements, depending on the strategy.

Answer: B,D

QUESTION NO: 3
Where can you define the valid receivers for production order costs?

A. In the valuation variant
B. In the production scheduling profile
C. In the settlement profile
D. In the costing variant

Answer: C

Prüfungsvorbereitung C_TSCM42_65 Studienmaterial deutsch SAP Certified Application Associate – Production – Planning & Manufacturing with SAP ERP 6.0 EHP5  https://www.it-pruefungen.de/C_TSCM42_65.htm

QUESTION NO: 4
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

A. Interactive single-item planning for the delayed assembly
B. Multi-level single-item planning with the “simulation mode” option
C. Total planning online
D. Multi-level single-item planning with the “display material list” option

Answer: B

QUESTION NO: 5
What does SAP ERP mean?

A. SAP ERP is a planning system in which extended planning processes can be mapped.
B. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials management, production and so on.
C. SAP ERP is a technological platform, on the basis of which customer-specific extensions can be imported.
D. SAP ERP is an application that an enterprise can use to manage its business processes efficiently.

Answer: D

IT-Prüfungen C_TSCM42_65 SAP Certified Application Associate – Production – Planning & Manufacturing with SAP ERP 6.0 EHP5 www.it-pruefungen.de

QUESTION NO: 6
Which functions can be triggered before releasing a production order? (Choose three)

A. Confirmation
B. Selection of a routing
C. Scheduling
D. Stock determination
E. Selection of a BOM

Answer: B,C,E

C_TSCM42_66 Prüfung, C_TSCM42_66 zertifizierung

www.it-pruefungen.de sap C_TSCM42_66 Prüfung, C_TSCM42_66 zertifizierung Production – Planning & Manufacturing with SAP ERP 6.0 EHP6

QUESTION NO: 1

You want to use the function “Read PP master data” in the production order.

However, while calling the function you receive an error message.

What could be the reason?

A. The material availability check has been performed.
B. Goods movements have been posted.
C. The production order has been released.
D. Order papers have been printed.

Answer: B

QUESTION NO: 2

Which objects can affect the calculation of capacity requirements for an operation? (Choose three)

A. Standard values (routing)
B. In-house production time (material master)
C. Transport time (routing)
D. Formulas (work center)
E. Operation control key (routing)

Answer: A,D,E

QUESTION NO: 3

In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives represents a firming type.

What does a firming type define? (Choose two)

A. Handling existing procurement proposals outside the planning time fence.
B. Handling existing procurement proposals within a planning time fence.
C. Handling new requirements within the planning time fence.
D. Handling new procurement proposals that need to be created due to new requirements within the planning time fence.

Answer: B,D

sap C_TSCM42_66 Prüfungsfragen, sap C_TSCM42_66 Examensfragen Production – Planning & Manufacturing with SAP ERP 6.0 EHP6 (ICND2 v3.0) www.it-pruefungen.de

QUESTION NO: 4

Which of the following scheduling types can only be used in capacity planning?

A. Midpoint
B. Forward
C. Only capacity requirements
D. Backward

Answer: A

QUESTION NO: 5

Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)

A. Task list
B. Work center
C. Production version
D. Bill of material
E. Material master

Answer: A,D,E

C_TSCM42_66 Prüfungsvorbereitung Studienmaterial sap deutsch Production – Planning & Manufacturing with SAP ERP 6.0 EHP6 www.it-pruefungen.de

QUESTION NO: 6

Which of the following master data can be used with process orders? (Choose three)

A. Serial numbers
B. Master recipes
C. Resources
D. Production/resource tools
E. Production versions

Answer: B,C,E